Testing source confusion and identification capability in Cherenkov telescope array data

4. March 2024

By ctao002-d

Performance of a small array of Imaging Air Cherenkov Telescopes sited in Australia

4. March 2024

By ctao002-d

Assembly and performance of SiPM arrays for the prototype SCT proposed for CTA

4. March 2024

By ctao002-d

Risk assessment of environmental conditions affecting the useful lifetime of Cherenkov telescopes at El Roque de Los Muchachos Observatory

4. March 2024

By ctao002-d

A trigger interface board for the Large and Medium Sized telescopes of the Cherenkov Telescope Array

4. March 2024

By ctao002-d

Mirror production for the Cherenkov telescopes of the ASTRI mini-array and the MST project for the Cherenkov Telescope Array

4. March 2024

By ctao002-d

Measurement of performances of the NectarCAM photodetectors

4. March 2024

By ctao002-d

White rabbit-synchronized accurate time-stamping solution for the Cherenkov Telescope Array

4. March 2024

By ctao002-d

Deep learning with photosensor timing information as a background rejection method for the Cherenkov Telescope Array

4. March 2024

By ctao002-d

Large scale characterization and calibration strategy of a SiPM-based camera for gamma-ray astronomy

4. March 2024

By ctao002-d

Posts navigation

Older posts